Hao Phuong completed stage 1- Supplying and installing automatic bagging and automatic palletizing robot for C.P Viet Nam – Factory no.5, Dong Nai

Hao Phuong completed stage 1- Supplying and installing automatic bagging and automatic palletizing robot for C.P VietNAM – Factory no.5, Dong Nai

Hao Phuong is honored to be the supplier and installer of the automatic packing system (Auto Packing) and the Automatic palletizing system (Palletizing) for CP Vietnam Livestock Joint Stock Company – Plant Branch 5 – Bau Xeo industrial park, Song Trau commune, Trang Bom district, Dong Nai.

Preparation

Hao Phuong had 90 days to prepare the mechanical processing. By the beginning of December 2019, the technical team transported robots, conveyors, machines and equipment to the factory to begin the installation phase of the system. By the end of January 2020, the system was completely installed, completed the test cabinet phase and program test operation.

Palletizing Robot system is deployed

Hao Phuong Robot Palletizing system is designed to work with a fully automatic pallet feeder system. This is an integrated system of:

  • Robot arm.
  • Sensor system.
  • Safety barrier.

All equipment is manufactured domestically, using standard mechanical equipment.

Exceptional Features

  • Built-in Checkweigher to check product weight, automatically remove The product does not reach the weight..
  • Working capacity reaches 900 bags/hour.
  • The robot has 180kg payload, can work with 2 production lines.
  • The gripper is capable of stacking multiple packing sizes: 10kg and 20kg.

Benefit

Using the robot bagging system is one of the optimal solutions to help minimize production and operation costs. Specific as follow::

  • Greatly reduce production costs, save costs.
  • High speed 24/24 operation, shorten the time of producing and transporting goods.
  • Ensuring accuracy, reaching safety standards.
  • Friendly programming interface, stable operation.

Estimated time for Phase 2

It is expected that the Phase 2 of the project will be constructed and installed in mid-March of 2020.

Project image

Here are some pictures of the construction process Phase I: Installing Palletizing system and testing system operation.

Install electric trough, flexible pipe and bracket for sensor

Install electric trough, flexible pipe and bracket for sensor

Wiring the dynamic cable

Wiring the dynamic cable

Complete safety barrier

Complete safety barrier – Pic. 1

Complete safety barrier

Complete safety barrier – Pic. 2

Fixed rail shuttle car and install chain

Fixed rail shuttle car and install chain

Signal and dynamic wiring

Signal and dynamic wiring

Installing chute through the cabinet

Installing chute through the cabinet

Connecting at the cabinets

Connecting at the cabinets

Connecting at the cabinets

Attaching Gripper, Inline conveyor

Attaching Gripper, Inline conveyor

Test I / O, Conveyor, Robot, Shuttle Car

The information about the Phase 2 of the project will be informed to our customers / partners in the near future. Stay tuned on Hao Phuong’s website!